Services
Comprehensive project plan
Realisation
Maintenance

Comprehensive project plan

We are experts in our field and as such we are happy to consult you on the following steps of the comprehensive project plan:

Safety report and risk assessment - based on our own survey we will be able to establish weak and sensitive spots that are a potential risk to the client.

Safety review and project - detailed report of safety measures including the estimation of costs
Project documentation - most detailed and client-tailored analysis which aims to combine all the factors that are important to the client. The most typical types of documentation that we provide are:

  • DSP - planning permission documentation
  • DZS (also DVZ) - tendering-procedure input
  • DPS - documentation for construction implementation - this is a universal documentation that applies to all, no matter who wins the tender. It is utilised in detail which provides a blueprint to issue a complex list of construction works, deliveries and a bill-of-quantities service in accordance with Annex number 13 of Decree 499/2006Sb. The project for construction implementation is an input for the construction implementation contractor and must be carried out by an authorised contractor - an architect or engineer (usually the person who drew up DSP).
  • SPS (SKP) - documentation of actual construction implementation - report on final condition of the construction works - this is described in detail in Decree 499/2006Sb.
    For MAXPROGRES Ltd., the highest priority is a happy customer who can turn to us in confidence and knows that they will be helped. The philosophy of our customer advisory service does not aim to provide a one-off drafting of a project; but first and foremost, it aims to provide long-term, high-quality cooperation with the client.

For MAXPROGRES Ltd., the highest priority is a happy customer who can turn to us in confidence and knows that they will be helped. The philosophy of our customer advisory service does not aim to provide a one-off drafting of a project; but first and foremost, it aims to provide long-term, high-quality cooperation with the client.

Realisation

We supply and install a wide range of safety systems; from basic, so-called commercial systems to more complex systems of the most recent generations. The realisation itself is carried out under the supervision of the project manager and the assembly group. Our technicians are certified to install the systems and the installation itself is performed in compliance with the standards and provisions in force. The installation of the systems is completed with a test run and revision of the system. A report of the performed final revision of the equipment is then issued for the user. During the test run, the user is given all technical documentation and is trained to operate the system. Throughout the service life of the systems, regular check ups and test runs are performed. The purpose of regular revisions is to ensure a match between the installation and project documentation, assembling instructions of the equipment’s developers and the standards and provisions in force.
An assigned vendor is available for the customer the whole duration of the realisation.

Our technologies

 FIRE SAFETY SYSTEMS FIRE SAFETY SYSTEMS  Zabezpečovací ústředny SECURITY SYSTEMS
 ACCESS CONTROL SYSTEMS ACCESS CONTROL SYSTEMS  Docházkové systémy ATTENDANCE SYSTEMS
 Kamerové systémy CCTV a IP SURVEILLANCE AND CCTV SYSTEMS, IP CAMERAS  Lokální a evakuační rozhlas LOCAL ALARM AND VOICE ALARM SYSTEMS
 Perimetrická ochrana PERIMETER INTRUSION DETECTION SYSTEMS  Televizní systémy TELEVISION DIVORCES
 Grafické nádstavbové systémy GRAPHIC EXTENSION SYSTEMS  Časové servery NETWORK TIME PROTOCOLS

Maintenance

Warranty and post-warranty service

Warranty service is valid from the day the customer receives their goods. It is carried out in compliance with the existing legislation. Typically, our customers receive a 36-month guarantee; this includes the installation and all technology provided by the suppliers, or a 24-month guarantee.
A 24/7, all-year-round hotline is available to all our customers.

Periodic activity

This includes a revision, functional test, system survey, operability check and a test run.
The purpose of a periodic activity is to detect potential defects of the given system and their subsequent removal.

Do not hesitate to get in touch,
we are here for you.

We will carry out a safety report of the given object in accordance with ...